CO2 captured sequestration#
Technology ID: CO2_CAPTURED_SEQUESTRATION
Input energy interface, with default energy:
CONSUMPTION: co2_captured
Technology behaviors:
OPTIM_PMAX
OPTIM_PATHWAY
Technology parameters:
ID |
Label |
Unit |
Behaviors |
Description |
---|---|---|---|---|
CONSUMPTION_COST |
Consumption cost |
Euro/t |
Consumption cost |
|
CAPEX_OVERNIGHT |
CAPEX Overnight |
Euro/t/h |
-Overall capital expenditure (only used for pathway optimization) |
|
DEINVEST_COST |
Deinvest cost |
Euro/t/h |
Deinvest cost (only used for pathway optimization) |
|
LIFETIME |
Lifetime |
Lifetime of the asset (only used for pathway optimization) |
||
YIELD_INVEST |
Yield of investment |
% |
Yield associated with investment |
|
INSTALL_MAX |
Max installation |
t/h |
OPTIM_PATHWAY |
Max installation (only used for pathway optimization) |
DECOMM_MAX |
Max decommissioning |
t/h |
OPTIM_PATHWAY |
Max decommissioning (only used for pathway optimization) |
PMAX |
Pmax |
t/h |
(not OPTIM_PMAX) and (not OPTIM_PATHWAY) |
Installed power capacity |
CAPEX |
CAPEX |
Euro/t/h/Year |
Capital expenditure (only used for capacity optimization) |
|
FOC |
Fixed Operating Costs |
Euro/t/h/Year |
Fixed Operating Costs (only used for capacity optimization) |
|
PMAXMIN |
Min Pmax |
t/h |
OPTIM_PMAX or OPTIM_PATHWAY |
Installed capacity lower bound for capacity optimization |
PMAXMAX |
Max Pmax |
t/h |
OPTIM_PMAX or OPTIM_PATHWAY |
Installed capacity upper bound for capacity optimization |
Model code:
stateON = AssetState('ON')
addEnergyConsumption(asset, stateON, availability=100)
finalize(stateON)