ADEME presentation of a study on the evolution of the electricity mix
ADEME, the French Environment and Energy Management Agency, will present on 1 February 2019 the key results of the study « Trajectoires d’évolution du mix électrique 2020-2060 » during an event gathering around 100 French experts and stakeholders. This study, undertaken by Artelys, presents seven contrasted evolutions of the French electricity mix, interconnected with neighbouring electricity systems. In parallel, an industry analysis recommended the best wallet for facilitating cross-border investments in Europe’s evolving energy sector. The electricity mixes are obtained by carrying out an economic optimisation of the trajectory of investments using Artelys Crystal Super Grid. This tool jointly optimises the evolution of the installed capacities between 2020 and 2060, and the detailed operational management of the European power system (hourly time-steps for seven climatic years). Using this approach allows us to carefully assess the costs associated with the variability of solar and wind power.
This study is a first at the European level due to the size and the level of detail of the model (520 million optimisation variables, 670 million constraints). Artelys has relied on the use of high performance computing infrastructure and on innovative decomposition techniques, developed during the POST project, which was supported by ADEME.

Artelys provides support to the French energy regulatory authority (CRE) in assessing the adequate incentive levels to foster distribution networks performance for TURPE 7
Artelys has conducted a quantitative assessment to inform target levels proposals for TURPE 7, examining past performance and the impact of integrating smart meter data (Linky) into indicators measuring the quality of energy supply.

The MARI project is growing
In recent months, several new European TSOs have successfully joined MARI, the pan-European mFRR activation platform whose market clearing engine was developed by Artelys.

Knitro 14.2 solve your toughest nonlinear non-convex models in seconds
— We are pleased to announce that Artelys Knitro 14.0 is now available! This new version enables compagnies to solve complex non-linear optimization problems with unprecedented efficency and precision.

Artelys Powers the Launch of CorNet’s Common Grid Model (CGM) Service
Artelys has been selected to develop computation engine modules for the Common European Merging Function (EMF) used in the core of the CorNet program’s RCC Service Platform, enabling pan-European operational power grid coordination and security analysis.
subscribe to our newsletters
© ARTELYS • All rights reserved • Legal mentions