ENTSOG and ENTSO-E publish Artelys study on gas-electricity interlinkages
The objective of the study Artelys has carried out was to provide recommendations to the ENTSOs on the way to account for interlinkages between gas and electricity during the project assessment phase. The study has focused on the identification of relevant projects for which a joint gas-electricity assessment is recommended. The proposed screening methodology aims at identifying the relevant projects for which the interactions between the gas and electricity systems have a sizable impact on their economic assessment. After a thorough analysis of the interlinkages between the gas and electricity sectors, and a discussion of the role of the scenario building phase, three key sources of interlinkages have been identified and studied: gas-to-power, power-to-gas and hybrid consumption technologies (e.g. hybrid heat pumps). The screening methodology includes criteria related to each of these interlinkages.

Artelys provides support to the French energy regulatory authority (CRE) in assessing the adequate incentive levels to foster distribution networks performance for TURPE 7
Artelys has conducted a quantitative assessment to inform target levels proposals for TURPE 7, examining past performance and the impact of integrating smart meter data (Linky) into indicators measuring the quality of energy supply.

The MARI project is growing
In recent months, several new European TSOs have successfully joined MARI, the pan-European mFRR activation platform whose market clearing engine was developed by Artelys.

Knitro 14.2 solve your toughest nonlinear non-convex models in seconds
— We are pleased to announce that Artelys Knitro 14.0 is now available! This new version enables compagnies to solve complex non-linear optimization problems with unprecedented efficency and precision.

Artelys Powers the Launch of CorNet’s Common Grid Model (CGM) Service
Artelys has been selected to develop computation engine modules for the Common European Merging Function (EMF) used in the core of the CorNet program’s RCC Service Platform, enabling pan-European operational power grid coordination and security analysis.
subscribe to our newsletters
© ARTELYS • All rights reserved • Legal mentions